A severe heatwave gripping the eastern US has pushed electricity demand to near-record highs, forcing PJM Interconnection, the nation’s largest power grid operator, to implement emergency measures. With generator issues and soaring air-conditioning needs, the grid is under immense strain, prompting calls for reduced consumption to avert blackouts. This extreme weather is also impacting July 4th celebrations and causing significant spikes in wholesale electricity prices.
Trending
- ‘Cruelty at its peak’: PoJK leader seeks support of Indians in protest against Pakistan
- Why houses in the Philippines stand on wooden stilts to survive floods, typhoons and extreme heat
- How High Altitude Pseudo Satellites will give India’s military eyes in the sky for weeks
- ‘Absolute power corrupts’: Raj Thackeray attacks BJP over ‘insensitive’ remarks on Mumbai deaths
- ‘I don’t think it is possible’: Keir Starmer says next PM cannot spend less time on diplomacy
- Centre puts Ram temple recce operative, Hafiz Saeed’s son-in-law on terror list
- ‘I went up to Messi after the game. He said … ‘: Vozinha after WC exit
- The surprising amount of trash Americans generate on July 4 weekend
