ISRO successfully conducted a key qualification test for Gaganyaan’s main parachute system. This test validated the parachute’s structural integrity under maximum expected load conditions. A simulated assembly was dropped from an aircraft to test the system’s performance. This marks the fifth integrated main parachute airdrop test for the mission. The successful test provides confidence in the parachute system for the upcoming uncrewed mission. ISRO successfully conducted a key qualification test for Gaganyaan’s main parachute system. This test validated the parachute’s structural integrity under maximum expected load conditions. A simulated assembly was dropped from an aircraft to test the system’s performance. This marks the fifth integrated main parachute airdrop test for the mission. The successful test provides confidence in the parachute system for the upcoming uncrewed mission.
Trending
- Another ‘Kuch Kuch Hota Hai’ moment in Indonesia as PM Modi, Prabowo try angklung
- History at Wimbledon: Arnav Paparkar becomes 1st Indian in 36 years to …
- Mamata Banerjee loses cool, slaps TMC worker during protest; BJP shares video
- China will benefit if India-US trade deal doesn’t happen: Economist Surjit Bhalla
- Towering trees more than 200 feet tall may not be as vulnerable to drought as scientists thought, new study reveals how Southeast Asia’s dipterocarps efficiently move water
- Saudi Arabia executes man convicted of luring wife to desert and burning her alive
- Pests, hygiene scare in pantries: Railway Ministry directs zones to follow strict cleaning protocols
- Connor Murphy cause of death: New details emerge after influencer’s tragic death in Thailand