In a heartwarming victory for Harry Potter fans, a significant power cable, originally set to cross Dobby the elf’s cherished fictional grave, was successfully rerouted. The Greenlink interconnector project, valued in the multimillions, was adjusted to preserve this beloved memorial. Developers resorted to horizontal drilling to lay the cable underground, safeguarding Dobby’s resting place on Freshwater West beach from any desecration.
Trending
- Donors raised $15.65M to save a giant California sequoia grove
- Romania has declared a 30-day energy alert as Danube river levels fall too low to cool its nuclear reactors
- Quote of the day by Rabindranath Tagore: “Everything comes to us that belongs to us if we…”
- Trump turns up heat on int’l students, warns US colleges over misuse of work permits
- Air India group starts mandatory substance screening for all pilots from today
- Rising temperatures are transforming Ireland into a rare wine country; the island now has 42 vineyards with upcoming bumper crops
- ICE arrests Canadian fugitive hiding in US for 3 decades over child sex offences
- Badal attacked with kirpan; cop hurt intervening: How assassination bid unfolded
