Setting a target to add 50 lakh new piped gas connections to the existing base of 1.6 crore, at a round table here, the minister called for accelerating expansion on a mission mode, and underlined the need for single-window approvals, integration with urban planning, last-mile connectivity and convergence with ongoing urban initiatives.