The Fernald uranium plant in Ohio stopped production in 1989 after nearly four decades of operations. A $4.4 billion environmental cleanup followed, involving radioactive waste, contaminated soil and groundwater. The 1,050-acre site was eventually transformed into the Fernald Preserve, with restored wetlands, prairie and forest. A Visitors Center now documents the site’s history and cleanup. The Fernald uranium plant in Ohio stopped production in 1989 after nearly four decades of operations. A $4.4 billion environmental cleanup followed, involving radioactive waste, contaminated soil and groundwater. The 1,050-acre site was eventually transformed into the Fernald Preserve, with restored wetlands, prairie and forest. A Visitors Center now documents the site’s history and cleanup.
Trending
- ED director Rahul Navin gets 1-year extension
- Clean power push: India hits 300 GW non-fossil capacity milestone ahead of 2030 target
- ‘$200 bn market in 15 countries’: Here’s what India can do if US slaps 100% tariffs
- In the 1990s, New York chose wetlands over conventional storm sewers on Staten Island
- Trump’s hair-do turns heads, has America all tangled up
- DGCA to conduct preliminary probe into Baramati aircraft runway excursion: Centre
- Sarfaraz Khan replaces Sai Sudharsan in India squad for Sri Lanka Tests
- ‘Attempt to murder’: TMC MPs blame BJP for attack on Mamata Banerjee’s car, claim CM Suvendu link